Pfeiffer Road Connection Project

8900 W Lincoln Hwy, Frankfort, IL60423
PROJECT SUMMARY

Status:  
Engineering Design Phase.
Description: Construct two-lane boulevard road with multi-use path, sidewalk, street lighting, street trees, and storm water management between US 30 and the Lighthouse Pointe subdivision. Construct a 12" water main connector concurrent with the project.
Funding Source:
Design Services - REBUILD Illinois Bond Funds & Utility Capital; Construction - Not committed at this time.
Preliminary Estimate of Construction Cost:  $2,000,000 
Planned Construction: 
 Not confirmed. Projected 2021-2023

Project History:
2004 Comprehensive Plan (pgs. 43, 75, 115, 116,  Framework Map, Future Land Use Map, Route 30 Special Area Plan)
2005 Bicycle Trail Master Plan
2007 Transportation Master Plan (pg. 26)
2019 2040 Comprehensive Plan (pgs. 60, 63, 64, 73, 102, 106, 136, 138, Future Land Use Map)
2020 Right-of-Way Dedication Agreement with land owner, Silver Cross Hospital
2020 Design Engineering Services Agreement

Upcoming Public Meetings:

None scheduled.


VIEW PLANS:Regional Site Plan
Site Plan
Design Cross Section